SDL PRO COMPLIANCE
Create Compliance
Generate Compliance Sheets
in Minutes
Simply open a job and click the Compliance button — customer and site details fill
automatically.
Create Compliance Includes
- Generate compliance sheets in minutes
- Auto-populate customer & site information
- Insert company and customer logos
- Include full site address & job details
- Wide range of scaffold compliance templates
- All compliance records kept against the job
- 16-digit verification code on every sheet
Every sheet is issued with a unique 16-digit verification code that clients can verify authenticity directly through SDL Pro.
Compliance Sheet
Auto-Generated PDF Compliance
Sheets
Once created, a PDF is automatically generated, attached to the job and available for
your customer to download from their portal.
Each Compliance Sheet Contains
- Auto-generated & downloaded PDF
- Attached directly to the job
- Customer portal download access
- Scaffold diagrams & drawings
- Full structural metrics (bays, lifts, load, reaction)
- Company & customer branding
- Unique 16-digit verification code
Compliance Rules
Built-in Dos & Don'ts on
Every Sheet
Every compliance sheet comes complete with its own guide clearly explaining
what can and cannot be done within compliance criteria.
Compliance Rules Cover
- What SDL Pro has assessed the scaffold for
- Scaffold limitations & restrictions
- What can be done within compliance criteria
- What cannot be done within compliance criteria
- Safe erection & use requirements
- Safe erection & use requirements
Compliance Sheet Library
24+ Scaffold Types Covered
Gain instant access to a growing library of compliance sheets covering the most
common scaffold structures used throughout the UK.
Current Categories Include
- Independent Scaffolds
- Front & Back Scaffolds
- Front & Back Scaffolds
- Temporary Roofs
- Buttress Handrails
- Tube & Fitting Staircases
- SYSTEM Staircases
- Drill & Fix Handrails
- Raker Buttress Handrails
- Beam Sections
- Piggy Back Beams
- Internal Loading Bays
- External Loading Bays
- Loading Bays with Gates
- Chimney Stack Scaffolds
- Scaffold Towers
- Protection Fans
- Rubbish Chutes
- Gin Wheel Scaffolds
- Gantry Scaffolds
- Roof Handrails
Note: Any arrangement outside this library requires a bespoke
scaffold design.
Compliance Sheet
TG20:26 Compliance Document
Each generated sheet follows TG20:26 standards — including structural data,
diagrams, loading information and full Dos & Don’ts guidance.
Document Includes
- Full TG20:26 compliance criteria
- Wind load calculations & tie requirements
- Snow load guidance
- Leg load specifications
- Foundation & lift height requirements
- Permissible & non-permissible items
- SDL Pro company branding & verification code
Compliance Rules
Scaffold-Specific Dos & Don'ts
Guide
Every compliance sheet comes with a built-in rules guide — protecting workers,
clients, and contractors throughout the project lifecycle.
Rules Guide Contains
- What SDL Pro has assessed the scaffold for
- Clear list of permitted (Dos) actions
- Clear list of prohibited (Don'ts) actions
- Scaffold limitations & restrictions
- Loading & usage boundaries
- Erection, use & maintenance standards
- Specific to each scaffold type & structure
Get in touch
Call +44 734 016 0800 or email info@sdl.pro to speak to a member of our team. Our expert designers can add value to your project, producing the bespoke scaffold your project requires.